OEM / ODM & Private Label
Custom Men's Sleepwear Manufacturer
KoalaPurr manufactures men's pajama sets, loungewear sets and sleep pants for menswear brands — woven cotton button-fronts, satin sets, and knit jersey or modal bottoms. Tops and bottoms are graded against your own size chart and can ship as matched sets or stand-alone SKUs. Send your references and we will come back with construction options, a sampling plan and a quotation.
- Own Factory & In-House Sampling
- MOQ: 100 pcs per style/color
- Sample Development: 7–14 Days
- Custom Labels & Packaging
Three Men's Sleepwear Ranges We Manufacture
Every range runs on the same minimums from the same factory. The three below cover the men's silhouettes we produce most.
Men's Pajama Sets
Button-front tops with elastic waist pants, striped, checked or printed.
View rangeMen's Loungewear Sets
Henley and T-shirt tops with jogger pants or shorts for everyday home wear.
View rangeMen's Pajama Pants
Sleep pants and pajama shorts, matched to the tops in your range.
View range- Product Screening
- Target audience
- Women
- Men
- Kids
- Baby
- Family
- Unisex
- Fabric Material
- Modal
- Bamboo Fiber
- Tencel Lyocell
- Cotton
- Satin
- Viscose
- Linen
- Polyester
- Rayon
- Fabric Type
- Knit
- Woven
- Ribbed
- Waffle
- Velvet
- Flannel
- Towel
- Use Scenario
- Sleep
- Home
- Everyday
- Travel
- Pattern & Decoration
- All-over Print
- Placement Print
- Embroidery
- Lace Trim
- Solid Color
- Stripe
- Style & Length
- Long Sleeve
- Short Sleeve
- Sleeveless
- Long Pants
- Shorts
- Regular Length
- Short Length
- Knee-Length
- Midi Length
- Long Length
Men's Sleepwear
OEM / ODM & Private Label
Custom Men's Sleepwear Manufacturer
KoalaPurr manufactures men's pajama sets, loungewear sets and sleep pants for menswear brands — woven cotton button-fronts, satin sets, and knit jersey or modal bottoms. Tops and bottoms are graded against your own size chart and can ship as matched sets or stand-alone SKUs. Send your references and we will come back with construction options, a sampling plan and a quotation.
- Own Factory & In-House Sampling
- MOQ: 100 pcs per style/color
- Sample Development: 7–14 Days
- Custom Labels & Packaging
Three Men's Sleepwear Ranges We Manufacture
Every range runs on the same minimums from the same factory. The three below cover the men's silhouettes we produce most.
Men's Pajama Sets
Button-front tops with elastic waist pants, striped, checked or printed.
View rangeMen's Loungewear Sets
Henley and T-shirt tops with jogger pants or shorts for everyday home wear.
View rangeMen's Pajama Pants
Sleep pants and pajama shorts, matched to the tops in your range.
View rangeFabrics and Options You Can Specify
Every order is developed from your brief rather than picked from a fixed catalog. Construction decides how a men's set wears, so we send swatches and confirm woven or knit before anything is cut.

- Fabrics
- Woven cotton poplin as the standard for button-front sets, plus cotton-polyester blends for price-driven lines, satin for a smoother face, and modal or jersey knit for pants and lounge sets. Weights are chosen for the season you sell into.
- Construction
- Woven or knit, and the two are not interchangeable. Woven poplin gives a pajama set its crisp shirt front and pressed appearance; knit gives sleep pants and lounge sets their stretch and drape. One order can carry both.
- Tops and bottoms
- Graded separately against your size chart, so a shirt and a pant can be ordered in different sizes inside one set. Also available as stand-alone SKUs when you only need one piece.
- Prints and colorways
- Subdued solids matched to a Pantone reference, yarn-dyed and printed stripes, checks, plaid and placement prints.
- Trims, labels and packaging
- Notch and shirt collars, button-front and fly fronts, chest pockets, elastic and drawstring waists, cuffed hems and contrast piping, with woven labels, care and content labels, hangtags, polybags and boxed presentation.
- Sizing and fit
- Work from your existing size chart, or have a graded run developed for the market you sell into.
From Your Design to a Shipped Order
Five stages, and you approve the sample before bulk production starts.
-
01
Send Your Brief
A tech pack, reference set, sketch or image, with your top and bottom size charts. We reply with a feasibility view, construction direction and a quotation. 1–2 days.
-
02
Fabric and Color Approval
We propose woven and knit options, weights and colors matched to a Pantone reference, then send swatches and lab dips for sign-off before anything is cut.
-
03
Sampling
We develop the pattern and grade the top and the bottom separately, then revise until you sign off the pre-production sample. 7–14 days plus revision rounds.
-
04
Bulk Production
Cutting, sewing, printing or embroidery and in-line checks run through our own workshop. 24–30 days from sample approval.
-
05
Inspection and Delivery
AQL final inspection, garment measurement and a packing check with a written report, then shipment FOB, CFR, CIF, EXW or DDP. 2–3 days.
Sampled, Sewn and Checked in Our Own Factory
Pattern, sampling, sewing and finishing run through our Dongguan workshop, so one team answers for the whole order. Fabric is bought to your brief and inspected on arrival. See our manufacturing capability.
Pattern and Sampling In House
Pattern development and full size grading from your tech pack or reference set, with the top and the bottom graded separately. First samples in 7–14 days.
Sewing and Finishing Lines
In-house assembly with contrast piping, chest embroidery, digital print and woven labels, finished with your hangtags and packaging.
Inspected Before It Ships
Incoming fabric check, in-line inspection, garment measurement, wash and color-fastness testing, and an AQL final inspection with a written report.

Fabric checked on arrival

Patterns developed in house

Our own sewing lines
Choosing Your Men's Sleepwear Range
Three guides that answer the questions buyers ask while they are still choosing a fabric and a silhouette.
01 / Fabric
Cotton vs Modal vs Bamboo vs TENCEL™
How each fiber behaves in wear and wash, and which one suits your price point and market.
Read guide02 / Sourcing
An OEM and ODM Sourcing Guide
What to prepare before you approach a pajama factory, and how each working model is priced.
Read guide03 / Quality
Quality and Wash Testing Explained
What shrinkage, color-fastness and AQL inspection actually measure, and why it matters to returns.
Read guideMen's Pajama and Sleepwear Manufacturing FAQs
The questions menswear buyers ask most often before placing a first order. Select a question to read the answer.
Can you make men's pajamas under our own brand?
Yes. We work as a private label and OEM men's sleepwear supplier. Your branding goes on the woven label, care label, hangtag and packaging, and our own label is not used on the finished garment.
Which fabrics are best for men's sleepwear?
Woven cotton poplin for a classic button-front set, cotton-polyester blends for price-driven lines, satin for a smoother face, and jersey or modal knit for pants and lounge sets. Swatches can be sent for you to compare weight and handle.
Can the top and the bottom be sized independently?
Yes, and most menswear buyers do it. Send your size chart and we grade the shirt and the pant separately, then pack them as matched sets or as separate SKUs. Both pieces are still cut from the same approved fabric lot.
Can you match a men's pajama set we already sell?
Send the reference set or a tech pack. We measure the top and the bottom, propose the closest available fabric and construction, and develop a sample for your approval before bulk production.
How long does sampling and bulk production take?
First samples typically take 7–14 days once fabric and fit are confirmed, then bulk production runs 24–30 days from sample approval. The stage-by-stage breakdown is set out above.
Start Your Men's Sleepwear Program
Send your silhouette references, fabric direction, top and bottom size charts and target quantity. We will come back with construction options, sampling steps and a quotation.
Fabrics and Options You Can Specify
Every order is developed from your brief rather than picked from a fixed catalog. Construction decides how a men's set wears, so we send swatches and confirm woven or knit before anything is cut.

- Fabrics
- Woven cotton poplin as the standard for button-front sets, plus cotton-polyester blends for price-driven lines, satin for a smoother face, and modal or jersey knit for pants and lounge sets. Weights are chosen for the season you sell into.
- Construction
- Woven or knit, and the two are not interchangeable. Woven poplin gives a pajama set its crisp shirt front and pressed appearance; knit gives sleep pants and lounge sets their stretch and drape. One order can carry both.
- Tops and bottoms
- Graded separately against your size chart, so a shirt and a pant can be ordered in different sizes inside one set. Also available as stand-alone SKUs when you only need one piece.
- Prints and colorways
- Subdued solids matched to a Pantone reference, yarn-dyed and printed stripes, checks, plaid and placement prints.
- Trims, labels and packaging
- Notch and shirt collars, button-front and fly fronts, chest pockets, elastic and drawstring waists, cuffed hems and contrast piping, with woven labels, care and content labels, hangtags, polybags and boxed presentation.
- Sizing and fit
- Work from your existing size chart, or have a graded run developed for the market you sell into.
From Your Design to a Shipped Order
Five stages, and you approve the sample before bulk production starts.
-
01
Send Your Brief
A tech pack, reference set, sketch or image, with your top and bottom size charts. We reply with a feasibility view, construction direction and a quotation. 1–2 days.
-
02
Fabric and Color Approval
We propose woven and knit options, weights and colors matched to a Pantone reference, then send swatches and lab dips for sign-off before anything is cut.
-
03
Sampling
We develop the pattern and grade the top and the bottom separately, then revise until you sign off the pre-production sample. 7–14 days plus revision rounds.
-
04
Bulk Production
Cutting, sewing, printing or embroidery and in-line checks run through our own workshop. 24–30 days from sample approval.
-
05
Inspection and Delivery
AQL final inspection, garment measurement and a packing check with a written report, then shipment FOB, CFR, CIF, EXW or DDP. 2–3 days.
Sampled, Sewn and Checked in Our Own Factory
Pattern, sampling, sewing and finishing run through our Dongguan workshop, so one team answers for the whole order. Fabric is bought to your brief and inspected on arrival. See our manufacturing capability.
Pattern and Sampling In House
Pattern development and full size grading from your tech pack or reference set, with the top and the bottom graded separately. First samples in 7–14 days.
Sewing and Finishing Lines
In-house assembly with contrast piping, chest embroidery, digital print and woven labels, finished with your hangtags and packaging.
Inspected Before It Ships
Incoming fabric check, in-line inspection, garment measurement, wash and color-fastness testing, and an AQL final inspection with a written report.

Fabric checked on arrival

Patterns developed in house

Our own sewing lines
Choosing Your Men's Sleepwear Range
Three guides that answer the questions buyers ask while they are still choosing a fabric and a silhouette.
01 / Fabric
Cotton vs Modal vs Bamboo vs TENCEL™
How each fiber behaves in wear and wash, and which one suits your price point and market.
Read guide02 / Sourcing
An OEM and ODM Sourcing Guide
What to prepare before you approach a pajama factory, and how each working model is priced.
Read guide03 / Quality
Quality and Wash Testing Explained
What shrinkage, color-fastness and AQL inspection actually measure, and why it matters to returns.
Read guideMen's Pajama and Sleepwear Manufacturing FAQs
The questions menswear buyers ask most often before placing a first order. Select a question to read the answer.
Can you make men's pajamas under our own brand?
Yes. We work as a private label and OEM men's sleepwear supplier. Your branding goes on the woven label, care label, hangtag and packaging, and our own label is not used on the finished garment.
Which fabrics are best for men's sleepwear?
Woven cotton poplin for a classic button-front set, cotton-polyester blends for price-driven lines, satin for a smoother face, and jersey or modal knit for pants and lounge sets. Swatches can be sent for you to compare weight and handle.
Can the top and the bottom be sized independently?
Yes, and most menswear buyers do it. Send your size chart and we grade the shirt and the pant separately, then pack them as matched sets or as separate SKUs. Both pieces are still cut from the same approved fabric lot.
Can you match a men's pajama set we already sell?
Send the reference set or a tech pack. We measure the top and the bottom, propose the closest available fabric and construction, and develop a sample for your approval before bulk production.
How long does sampling and bulk production take?
First samples typically take 7–14 days once fabric and fit are confirmed, then bulk production runs 24–30 days from sample approval. The stage-by-stage breakdown is set out above.
Start Your Men's Sleepwear Program
Send your silhouette references, fabric direction, top and bottom size charts and target quantity. We will come back with construction options, sampling steps and a quotation.









